The supply of chlorine from a dosing system with only one cylinder or battery inevitably leads to failure of the chlorination when empty and requires personnel in order to change cylinders.
Chlorine gas dosing systems in a water treatment system must be permanently ready for operation so that the water can be sufficiently disinfected at any point. This explains the fitting of the systems with two supply batteries - one side in operation, the other on stand-by. The vacuum chlorine changeover unit effects automatic switching between the two cylinders or drum batteries. The device is suitable for total
vacuum systems - the vacuum regulator is part of the supply battery
JESCO have both non-electical and electrical changeover valve systems to handle your chlorine gas treatment systems. The electrically operated units can supply additional feedback to centralised control systems.
Process Pumps (Australia) stocks a wide range of JESCO spare parts and service kits. Our commitment is to ensure our client have a minimal amount of downtime due to pump maintenance and receive first class techical support in ensuring their process runs at optimal efficiency.
Please don't hestiate to contact us with any questions regarding the JESCO range of equipment and we will be happy to assist you further.
With a fully fitted workshop, Process Pumps (Australia) can provide first class pump maintenance from simple repairs to full overhauls. For in place complex dosing systems requiring on site commissioning and service, please contact us so we can organise the best level of service that suits your requirements.